 |
 |
|
Track the Inventory to avoid any possible pilferages at the plant and construction site with the help of |
| |
|
| - |
|
REAL time Remote Monitoring System . |
| - |
|
Time stamped photographs of the goods carrying vechile on every GRN. |
|
 |
|
Optimise the Inventory . |
 |
|
Identity and stop the material theft . |
 |
|
Enhance efficiency and reduce operating cost . |
 |
|
mprove employee productivity by avoiding data |
 |
|
Seamless third party application integration |
|
|
| Silent Features : |
 |
|
Keep track of each “In and Out “ Vehicle from the plant area ,24 x7 with the help of, Cameras and Magnetic Loop Sensors. |
 |
|
Generates GRN with actual time stamped photograph of the inward and outward goods carrying vehicles . |
 |
|
Totally integrated system with Weighbridge and Boom Barriers. |
 |
|
Online remote monitoring as powerful third eye to keep close watch on every single transaction. |
 |
|
Magnetic loop sensors are provided to control any kind of manipulation , which generally takes place during taking loaded / unloaded weight of the vechile on |
| |
|
weighbridge . |
 |
|
Provides auto – system generated reports through e-Mail that prevents manipulation in the reports . |
 |
|
Automated SMS Facility to provide current Inward /Outward status allows to know the updated status without being dependent on any assistance |
 |
|
User level authentication to restrict unauthorized access to the data. |
 |
|
Facility to migrate data at HO from all the plant for the analysis and verification purpose. |
 |
|
Auditing of the in out vehicles/transactions at site location as well as at head office. |
 |
|
Provided with database backup facility. |
 |
|
Easy to use and operate. |
| RITS generates various types of reports such as |
 |
|
Supplier wise inward material . |
 |
|
tem wise inward material . |
 |
|
Plant wise out ward material . |
|
 |
|
Source location wise inward material . |
 |
|
Source location wise inward material . |
 |
|
Vehicle trip details . |
|
 |
|
Site location wise Raw /Processed outward material . |
 |
|
Item wise outward material . |
 |
|
Expected and actual load carried by the On-Contract Vehicles . |
|
 |
|
Material Supplied by /Issue to the other plant company. |
 |
|
Site Location wise expected and actual consumption of the material . |
|